Remarks: In a rare move, NS has decided to stop renumbering these trains after being emptied at Georgia Power's Plant Scherer. This means that each train will carry the same number both loaded and empty. (hence the reason this northbound empty still has its even "loaded" number) Another oddity lies in the fact that there is only one engine up front with a second shoving on the rear; these trains usual run with 2x1 configuration!